Project Name:
On-Call Survey for Snohomish County PUD


Jurisdition:

Snohomish County PUD #1

Services Provided:
Surveying

Location:
Various Snohomish County locations

Example Projects:
Triad Associates was an on-call surveyor for Snohomish County PUD from 1993 to 2005, completing numerous surveys for design of the County’s infrastructure improvements. Here are descriptions for three representative projects:

Sultan Pipeline:
Using GPS surveying techniques, we established control for the aerial mapping for a waterline extension from the m the Sultan River to the City of Sultan. The project included detailed profile and cross-sections of the proposed pipeline crossing of the Sultan River and a boundary survey of the City of Sultan water tank site. Triad prepared legal descriptions and right-of-way plats for submittal to Washington State Department of Natural Resources and provided construction staking services for construction of a bridge across the Sultan River.

Lake Stevens/Machias Water Main Extension:
Triad established control for aerial mapping of the Machias waterline extension and two smaller water line extensions in the Lake Stevens area. We also conducted a boundary and topographic surveys of the Machias pump station and two reservoir sites near Granite Falls.

Storm Lake Water Tank Site:
Triad performed topographic surveys of the proposed water tank site, pump station and access road and a boundary survey of proposed water tank site and pump station sites. We also prepared legal descriptions for the water tank site and access road and established control for aerial mapping of the approximate two-mile pipeline route between the pump station and water tank.

Timeline:
2002 - 2005
Portfolio - Public-Sector Survey